7/04/2009
Bridges
That was the line of business today. Formed. Fitted. Ready for action. Really like how this turned out. Mirrors the profile of the tire well. The disk brake bridge also is curved too. (shown just before she was tacked in place utilizing a framebuilders 3rd hand..) I must admit that these were relatively the same amount of work as I have found making a straight bridge. A little extra effort as per the curve, but I think that little extra step is worth it in the end. More on this next week. All that's left with the 29f1 and 26s for Franky is to fit/weld up the disk mounts. Then these are ready for paint. Better even ready to ride.
Happy 4th everyone. Get out and ride before the picnics and fireworks start..